    The Medical College of Wisconsin erected the 7T Building to house the 7 Tesla scanner and offices. The construction spanned from October 2011 to October 2012.

     

    October 2012

    Left to right:  On the left, a cabinet in the 7T Equipment Room houses a gradient chiller. The other cabinet on the right

    contains RF electronics. Insulation panels are next to it.